Clean room decoration:

Depending on whether it has a certain level of professional qualification and engineering performance of purification engineering company, Wuxi purification company has a group of excellent engineering and technical personnel of ventilation, water, electricity, heating and environmental planning and design. According to different needs of different customers, the company's professional personnel are tailored for each customer to create a safe and comfortable environment. Integrated design of place, space, safety requirements, shape, tone, function and convenience. And has a hvac, plumbing, electrical, water supply and drainage and other types of professional construction team. The excellent engineering performance of clean room decoration is all over the electronic industry, pharmaceutical industry, food industry, teaching and scientific research and other clean room application fields at home and abroad.

Clean room decoration

Second question: What are the specific work contents of clean room decoration?


Clean room decoration is mainly divided into six parts:


I. Determine the scheme and quotation, and sign the contract:


Generally, it is to look at the site first, and many programs need to be designed according to the site situation, and the workshop production products. Different industries have different requirements, different levels, and different prices. It is necessary to inform the designer of the decoration level and area of the dust-free workshop, and drawings are available under the ceiling and beam. Convenient late design, but also reduce the time. After the scheme price is determined, the contract will be signed to start construction.


Two, color steel plate partition installation:


Equivalent to the general frame, all the partition walls will be done after the material approach, and the time will be determined according to the plant area. Dust-free workshop decoration belongs to industrial plant, generally relatively fast.


Three, smallpox ceiling:


After the partition is installed, it is necessary to install the ceiling, which can not be ignored. Equipment will be installed on the ceiling, such as FFU filters, purification lights, air conditioning, etc. Lifting screws, plate distance should be in accordance with the regulations. Reasonable layout, so as not to have unnecessary trouble later.


Four, equipment and air conditioning installation:


Dust-free workshop purification industry main equipment includes: FFU filter, purification lamp, tuyere, air shower, air conditioning and so on. Equipment approach is generally a little slow, it takes time to make spray paint. Therefore, after signing the contract, attention should be paid to the equipment approach time. At this point, the workshop installation is basically complete, and the next step is the ground engineering.


Five, Doors, Windows and ground engineering:


Doors and Windows engineering with color steel plate partition engineering, equipment installation engineering and ground engineering scientific arrangement. The following problems should be clarified in the construction of ground engineering: What ground is suitable for what floor paint? What should we pay attention to in the construction season of floor paint? How about the temperature and humidity? How long after construction is completed?


Vi. Acceptance:


Check that the partition material is in good condition. Whether the workshop meets the purification grade standard. Whether the equipment in each area can operate normally, etc.