How to manage civilized construction in the field of clean engineering

Popularity:13 Release time:2022-11-02 18:05:02

Clean engineering has high scientific and technological content and strong comprehensiveness. It must be standardized and constructed by professional purification construction enterprises. In the operation, should do a good job in the following fields of civilized construction.

How to manage civilized construction in the field of clean engineering

Ecological and environmental protection and energy conservation: ecological and environmental protection, energy conservation and environmental protection are national strategic layout. In the implementation of clean engineering, environmental pollution is prohibited in the process of transportation, storage and operation of engineering materials. Waste must be treated separately. According to the different requirements of ecological and environmental protection noise guarantee day and night, the operation time of clean workshop operation should be reasonably coordinated and arranged, and measures should be taken to save electricity and water.

Quality PROTECTION: In strict accordance with the clean engineering construction drawings and related specifications, for the incoming materials according to the provisions of spot check, test, qualified can be used. For key parts, sample production should be carried out, and large-scale operation should be carried out after the approval of the owner and supervision engineer.

For the special production process, special process regulations must be formulated, and the construction personnel of the clean workshop should be skilled in the special process regulations. Work inspection records, work acceptance records and other records should be filled in time to ensure that the files are synchronized with the project.

Safety assurance: During the implementation of clean engineering, there should be emergency rescue plan for safety assurance, all construction personnel should have safety training, and make safety marks in important positions, strengthen the fire prevention work at the construction site, strictly implement the fire safety regulations, responsibility to people, and put an end to the use of unproductive open flames at the site.

Protection of finished products: During the construction of clean engineering, equipment and materials should be protected from rain and snow and sunscreen to avoid aging, rust and corrosion of equipment and materials. For important equipment and equipment such as air filters, special areas should be set up for storage, and unified protection and warning marks for finished products should be provided on site.

Operation under special meteorological conditions: with temporary heating equipment to ensure the requirements of clean workshop operation in winter. When the ambient temperature may be lower than zero, insulation and anti-freezing measures should be taken for working water pipes. In addition, rain prevention measures should be done in the working area of the clean engineering site. All orifices leading to the outside world should be closed during the sandstorm, and the operation and debugging of the system should be stopped.