+86-510-83599928

Corporate News

Your position:HOME > NEWS > The clean room needs to be tested after completion

The clean room needs to be tested after completion

Popularity:11 Release time:2021-07-21

The general detection range of clean room: clean room environmental grade assessment, engineering acceptance testing, including food, health products, cosmetics, bottled water, electronic products production workshop, GMP workshop, hospital operating room, animal laboratory, biosafety laboratory, biosafety cabinet, ultra-clean workbench, dust-free workshop, aseptic workshop, etc.

The clean room needs to be tested after completion

Clean room detection items generally include: the number of dust particles in the clean room, settling bacteria, plankton bacteria, pressure difference, ventilation times, wind speed, fresh air volume, illumination, noise, temperature, relative humidity, etc.

Reference standard for clean room testing:

1 "Code for Clean Plant Design" GB50073-2001

2 Technical Code for Building of Hospital Cleaning and Surgery Department GB 50333-2002

3 Technical Code for Construction of Biosafety Laboratories GB 50346-2004

4 Code for Clean Room Construction and Acceptance GB 50591-2010

5 "Pharmaceutical industry clean room (area) test method of suspended particles" GB/T 16292-2010

6 "Pharmaceutical industry clean room (area) test method of planktonic bacteria" GB/T 16293-2010

7 "Medical industry clean room (area) sedimentation bacteria test method" GB/T 16294-2010


cache
Processed in 0.004446 Second.